Statistical Characterization of Reliability Parameters in Medium-Voltage Networks: A Comprehensive Analysis

J.A. Clavijo-Blanco(1), M.A. González-Cagigal(2) J.A. Rosendo-Macías(2)

1.- Department of Electrical Engineering. E.S.I. University of Cádiz.. Campus Universitario de Puerto Real, Avda. de la Universidad, 10, 11519, Cádiz (Spain)

2.- Department of Electrical Engineering. E.T.S.I. University of Seville. Camino de los descubrimientos, s/n, 41092, Sevilla (Spain)

ftf

2025-07-25

im2r

Abstract

In the context of reliability of distribution networks, this work provides a statistical characterization of key reliability parameters for effective management of medium-voltage (MV) networks. Specifically, six parameters are analyzed, namely time to locate, time to switch, time to start repair, time to repair, time to restore normal configuration, and time between failures. A statistical fitting procedure is applied to data obtained from a distribution system operator (DSO) database. This work considers both aggregated and disaggregated groups of MV network components. The obtained results show that overhead lines exhibit the longest location times, whereas underground cables takes the longest repair durations. The presented statistical characterization provides useful data for developing elaborated reliability models of MV networks with similar configurations and might be used as a valuable benchmark for future studies.

Key words: Distribution Network Operation, Failure Management, Reliability Parameters, Statistical Characterization

Published in: Renewable Energies, Environment & Power Quality Journal (REE&PQJ)
ISSUE: Vol. 3. No.1 Pages: 44-52
E-ISSN: 3020-531 X Date of Current Version: 2025-06-25
REF: 258-25 Issue Date: 2025-07-25
DOI:10.24084/reepqj25-258 Publisher: AEDERMACP/ EA4EPQ

References

[1] J. Ayaburi, M. Bazilian, J. Kincer, and T. Moss, “Measuring ‘Reasonably Reliable’ access to electricity services,” Electricity Journal, vol. 33, no. 7, Aug. 2020, doi: 10.1016/j.tej.2020.106828.

[2] M. I. Muhammad Ridzuan, M. A. Z. Rusli, and N. Mohd Saad, “Reliability Performance of Low Voltage (LV) Network Configuration,” in Lecture Notes in Electrical Engineering, Springer, 2020, pp. 783–793. doi: 10.1007/978-981-15-2317-5_65.

[3] Frank Wirtz, “Influence on Reliability of Supply and its Marginal Costs in Medium-Voltage Networks,” in 2007 IEEE Lausanne Power Tech, Lausanne, Switzerland: IEEE, Jun. 2007, p. 2235.

[4] R. E. Brown, Electric Power Distribution Reliability, Second Edition. New York: CRC Press, 2009.

[5] Council of European Energy Regulators, “Third Benchmarking report on quality of electricity supply 2005,” Bruxelles, Dec. 2005.

[6] A. Sumper, A. Sudrià, R. Ramirez, R. Villafáfila, and M. Chindris, “Índices de continuidad en redes de distribución y su mejora,” in 9o Congreso HISPANO LUSO Ingeniería Eléctrica (9CHLIE), Marbella, Jul. 2005.

[7] A. Vinogradov et al., “Analysis of the power supply restoration time after failures in power transmission lines,” Energies (Basel), vol. 13, no. 11, Jun. 2020, doi: 10.3390/en13112736.

[8] IEEE Power and Energy Society, “IEEE Standards 1782-2022 - IEEE Guide for Collecting, Categorizing, and Utilizing Information Related to Electric Power Distribution Interruption Events,” IEEE, 2022.

[9] C. C. Liu, S. J. Lee, and S. S. Venkata, “An expert system operational aid for restoration and loss reduction of distribution systems,” IEEE Transactions on Power Systems, vol. 3, no. 2, pp. 619–626, 1988, doi: 10.1109/59.192914.

[10] A. Vinogradov et al., “А System for Monitoring the Number and Duration of Power Outages and Power Quality in 0.38kV Electrical Networks,” in Advances in Intelligent Systems and Computing, Springer Verlag, 2019, pp. 1–10. doi: 10.1007/978-3-030-00979-3_1.

[11] E. G. Carrano, G. P. Da Silva, E. P. Cardoso, and R. H. C. Takahashi, “Subpermutation-Based Evolutionary Multiobjective Algorithm for Load Restoration in Power Distribution Networks,” IEEE Transactions on Evolutionary Computation, vol. 20, no. 4, pp. 546–562, Aug. 2016, doi: 10.1109/TEVC.2015.2497361.

[12] S. B. Aruna, D. Suchitra, R. Rajarajeswari, S. George Fernandez, and C. Autor, “A Comprehensive Review on the Modern Power System Reliability Assessment,” International Journal of Renewable Energy Research (IJRER), vol. 11, no. 4, pp. 1734–1747, Dec. 2021.

[13] J. A. Clavijo-Blanco, M. A. González Cagigal, and J. A. Rosendo-Macías, “A fitting procedure for probability density functions of service restoration times. Application to underground cables in medium-voltage networks,” Electric Power Systems Research, vol. 217, Apr. 2023, doi: 10.1016/j.epsr.2023.109128.

[14] J. A. Clavijo-Blanco and J. A. Rosendo-Macías, “Failure rates in distribution networks: Estimation methodology and application,” Electric Power Systems Research, vol. 185, Aug. 2020, doi: 10.1016/j.epsr.2020.106398.

[15] J. A. Clavijo-Blanco, M. A. González-Cagigal, and J. A. Rosendo-Macías, “Statistical characterization of reliability indices in medium voltage networks using a Monte Carlo-based method,” Electric Power Systems Research, vol. 234, Sep. 2024, doi: 10.1016/j.epsr.2024.110585.

[16] M. I. M. Ridzuan and S. Z. Djokic, “Energy regulator supply restoration time,” Energies (Basel), vol. 12, no. 6, Mar. 2019, doi: 10.3390/en12061051.

 
logos0
 
br

| Main | Articles | Publication-Regulations | Committees | Publication-Ethics | Open-Access | Fees | Background |

REE&PQJ is edited by:

European Association for the Development of Renewable Energies, Environment and Power Quality (EA4EPQ/AEDERMACP)

ICREPQ

Copyright © 2025 EA4EPQ All rights are reserved