Abstract Since offshore wind energy production is taking part in different countries´ energy mixes, significant cost reductions have been developed during last years. Together with offshore wind turbine power size one of the key improvements is stepping up inner-array system rated voltage from 33 kV to 66 kV or even to 132 kV expected for the beginning of the next decade. As the offshore wind turbines that currently range between 16~20 MW are being installed and up to 26 MW have been announced recently, the increase of voltage is a need in order to make more efficient collector system and to cut down costs, consequently, reducing the levelized cost of energy. This work presents an inner-array power losses analysis, as well as, covers and compares current collector system voltage at 66 kV with the new expected 132 kV voltage level. Losses distribution is calculated according to IEC 60287 international standard. The results show that the energy losses are reduced if compare to actually 66 kV voltage. Key words: Array system, offshore wind farm, energy losses, 132 kV
References [1] TG Wind. Offshore Wind Farms Database. Available: https://www.tgs4c.com/ [2] B. L.White, R. Keast and D. Gütschow, "132kV identified as next array operating voltage for offshore wind," 11th International Conference on Renewable Power Generation - Meeting net zero carbon (RPG 2022), Hybrid Conference, London, UK, 2022, pp. 75-79, doi: 10.1049/icp.2022.1671. [3] The Carbon Trust, “Unlocking the next generation of offshore wind: step change to 132kV array systems", June 2022. [4] The Carbon Trust, “Transition to 132 kV offshore wind farms: industry update”, June 2025. [5] Bundesamt für Seeschifffahrt und Hydrographie, “Änderung des Flächenentwicklungsplans 2025 für die deutsche Nordsee und Ostsee und Ergebnis der Vorprüfung des Einzelfalls über die Durchführung einer Strategischen Umweltprüfung”, January 2026. [6] World Forum Offshore Wind “Floating Offshore Wind Dynamic Cables: Overview of Design and Risks”, February 2024. Available:https://wfoglobal.org/wpcontent/uploads/2024/02/WFO-Cables-and-FOSS-White-Paper.pdf [7] J. Khodaparast, D. Granly, A. Holdyk, T. Treider, A. Borgli, “132 kV Inter-array Cable Network”, February 2024. Available: https://www.northwindresearch.no/wp-content/uploads/2024/02/MEMO-final.pdf [8] IEC 60287 Calculation of the current rating - Part 1: Current rating equations (100 % load factor) and calculations of losses. [9] Puertos del Estado. Ministerio de Transportes y Movilidad Sostenible. https://www.puertos.es/servicios/oceanografia [10] Global Wind Atlas. https://globalwindatlas.info/es [11] Mapa Eólico Ibérico. https://www.mapaeolicoiberico.com/ [12] Y. Saint-Drenan, R. Besseau, M. Jansen, I. Staffell, A. Troccoli, L. Dubus, J. Schmidt, K. Gruer, S. Simões, S. Heier “A parametric model for wind turbine power curves incorporating environmental conditions” Renewable Energy Vol. 157, September 2020, pp. 754-768. [13] J. Dai, D. Liu, L. Wen, X. Long. “Research on power coefficient of wind turbines based on SCADA data”. Renewable Energy 86, 2016, pp. 206-215. [14] XLPE Submarine cable systems. Attachment to XLPE land cable systems – User´s guide. Rev 5. ABB. |
||||||||||||
![]() |
||||||||||||
![]() |
||||||||||||
|
||||||||||||