A comparative assessment of different alternatives
to repower transmission
corridors for the future supergrid
M. Borau-Rumbao, P. Cruz-Romero, A. de-la-Villa-Jaén
2017/04/25
|

Abstract
In order to allow the integration of the
maximum amount of renewable energy in the European network, it is necessary
to think about different solutions that meet the technical requirements
at the same time that are compatible with the investment shortage. One
option could be the development of a supergrid based on the uprating of
the existing transmission system. In this paper, three different alternatives
are proposed. The first two options require the installation of an upper
module,
being the difference of both options in the transmission technology: HVAC
or HVDC. The third option consists in mixing both technologies, making
use of the existing double circuit towers. At the end, a comparison between
the three alternatives is shown.
| Published in: Renewable Energy
& Power Quality Journal (RE&PQJ, Nº. 15) |
| Pages: 803-807 |
Date of Publication: 2017/04/25 |
| ISSN: 2172-038X |
Date of Current Version: |
|
REF: 470-17
|
Issue Date: April 2017 |
| DOI:10.24084/repqj15.470 |
Publisher: EA4EPQ |
Authors and affiliations
M. Borau-Rumbao, P. Cruz-Romero, A. de-la-Villa-Jaén.
Department of Electrical Engineering. Escuela Técnica Superior
de Ingeniería, Universidad de Sevilla, (Spain)
Key word
Supergrid, uprating, HVAC, HVDC, hybrid.
[1] Dirk Van Hertem and Mehrdad Ghandhari, Multi-terminal
VSC HVDC for the European supergrid: Obstacles.
Renewable and Sustainable Energy Reviews 14 (2010) 3156 3163.
[2] Hakan Ergun, Barry Rawn, Ronnie Belmand and Dirk Van Hertem, Optimization
of Transmission Technology and Routes for Pan-European Electricity Highways
Considering Spatial Aspects. Department of Electrical Engineering,
division ELECTA. University of Leuven, Belgium.
[3] Noman Ahmed, Staffan Norrga, Hans-Peter Nee, Arf Haider, Dirk Van
Hertem, Lidong Zhang and Lennart Harnefors, HVDC SuperGrids with
Modular Multilevel Converters the Power Transmission Backbone of
the Future. 2012 9th International Multi-Conference on Systems,
Signals and Devices.
[4] J. Lundkvist, I. Gutman and L. Weimers. Feasibility Study for
Converting 380 kV AC Lines to Hybrid AC / DC Lines.
EPRIs High Voltage Direct Current & Flexible AC Transmission
Systems Conference. Westminster, CO, USA.
November 5-6 2009.
[5] S. Kishore Teegala and S. Kumar Singal., Economic Analysis of
Power Transmission Lines using Interval Mathematics. J Electrical
Engineering Technology 2015; 10 (4): pp. 1471-1479
[6] Andrés Granero, Ventajas e inconvenientes de las tecnologías
HVAC y HVDC. Ingeniería de Máquinas y Sistemas Eléctricos.
(2016).
[7] Sven Rüberg, Helder Ferreira, Angelo LAbbate, Ulf Häger,
Gianluca Fulli, Yong Li and Johannes Schwippe, Research, methodologies
and technologies for the effective development of pan-European key grid
infrastructure sto support the achievement of a reliable, competitive
and sustainable electricity supply. Technical University Dortmund
(TUDo). Project no 219123.
[8] Armando L. Figueroa Acevedo, Michael S. Czahor and David E.
Jahn, A comparison of the technological, economic, public policy,
and environmental factors of HVDC and HVAC interregional transmission.
Wind Energy Science, Engineering, and Policy (WESEP), Iowa State University,
Ames, IA, 50014, USA.

|
|