Abstract

For a Small Hydropower Plant (SHP), theinstallation capacity is one of the most important issues in planning step. This paper presents a methodology for the capacity sizing of SHP based on assured energy. The analyzes were substantiated on historical series with daily streamflow data, operating limits of the turbines, forced unavailability due to the minimum streamflow of the turbine, Turbine efficiency variation in function of the streamflow variation and a project with two turbines operating in parallel of different type and size. The methodology was developed at the Tijuco River Basin in Brazil, with the data of Ituiutaba fluviometric station. It was used the time series from 1975 to 2017 (43 years). The results show that the analysis can be executed already in the initial phases of a hydroelectric project of the SHP.

Published in: Renewable Energy & Power Quality Journal (RE&PQJ, Nº. 17)
Pages: 14-18 Date of Publication: 2019/07/15
ISSN: 2172-038X Date of Current Version:2019/04/10
REF: 203-19 Issue Date: July 2019
DOI:10.24084/repqj17.203 Publisher: EA4EPQ

Authors and affiliations

J.H.I. Ferreira1, J.R. Camacho2
1. Instituto Federal do Triângulo Mineiro – Câmpus Ituiutaba (Brazil)
2. School of Electrical Engineering, Universidade Federal de Uberlândia, Brazil

Key words

Small Hydropower Plant, Assured Energy, Renewable Energy, Turbine Efficiency, Hydroelectric Potential Estimate.

References

[1] C. S. M. Júnior, I. C. Nasser, M. M. Filho, O. L. Tortelli. “Estimating the physical guarantee of hydroelectric plants with non-centralized dispatch”. Brazilian Journal of Energy, 2016, v.22, n.2, p.44-53. {In portuguese}
[2] B. T. C. Vasconcellos. “Analysis of the physical guarantee of hydroelectric plants not centrally dispatched and the potential of hybrid complementation. MSc Dissertation, Universidade Federal de Itajubá, Itajubá, Minas Gerais, Brazil, 2018. {In portuguese}
[3] ANEEL – National Electrical Energy Agency. Resolution no 673, August 4, 2015. Establishes the criteria for the framework of hydroelectric use in the condition of Small Hydroelectric Power Plant. Official Diary of the Union, Brasília, FD, August 31, 2015, Section 1; p.118. {In portuguese}
[4] M. L. B. Silva. “Analysis of the methodology of the MME / ANEEL for the calculation of the amounts of assured energy and energy physical guarantee of SHPs: Case study of a SHP.” End of course work, Universidade Federal de Santa Catarina, Florianópolis, Santa Catarina, Brazil, 2016. {In portuguese}
[5] ANEEL – National Electrical Energy Agency. Technical Note no 63, August 29, 2012. Definition of regulatory parameters associated with the approval of basic projects of hydroelectric plants not centrally dispatched. {In portuguese}
[6] MME – Ministério de Minas e Energia. Ordinance no.463, December 3, 2009. Establishes the methodology for calculating and reviewing the amounts of energy physical guarantee of Hydroelectric Power Plants not centrally dispatched by the National Electric System Operator - ONS. Official Diary of the Union, Brasília, DF, December 4, 2009, Section 1, p.74. {In portuguese}
[7] ANEEL – National Electrical Energy Agency. Technical Note no 68, September 6, 2013. Analysis of contributions in AP 068/2012, referring to the definition of regulatory parameters associated to the approval of basic projects of not centrally dispatched hydroelectric plants. {In portuguese}
[8] SEMI Industrial. SHP – Small Hydro Plant. Available at: http://www.semi.com.br {In portuguese}
[9] Anagnostopoulos JS, Papantonis DE. Optimal sizing of a run-of-river small hydropower plant. Energy Conversion & Management 2007; 48:2663-2670. https://doi.org/10.1016/j.enconman.2007.04.016.
[10] Barrero JMB, Muro JCSD, Macías EJ, de la Parte MP. Comparasion in the aplication of the exploitation by optimal head model to hydroelectric power station in run-of-river systems with different types of turbines. Renewable Energy & Power Quality Journal 2011; 9:1338-1343. https://doi.org/10.24084/repqj09.643.
[11] Brazilian Power Plants. Guidelines for studies and small-scale projects Hydraulics. Rio de Janeiro, Brazil, 2000. 458 p. {In portuguese}.
[12] National Water Agency. National information system on water resources. Availabe from: <http://www.snirh.gov.br. {In portuguese}
[13] MINAS GERAIS INSTITUTE OF WATER MANAGEMENT. Ordinance nº 49, de July 01 2010. Establishes the procedures for the regularization of the use of water resources in the state of Minas Gerais, Executive Power Journal, Belo Horizonte, MG, Brazil, July 06,. 2010. {In portuguese}.
[14] A. A. Reis, M. Naghettini and M. D. Melo, “Comparative Study, Application and Setting Appropriate Methodologies to Determine the Ecological Flow in Pará River Basin, in Minas Gerais State”, XVII Brazilian Symposium of Water Resources, 2007. {In Portuguese}.