| |
 |
Capacity Sizing
of a Small Hydropower Plant using Assured Energy Analysis
J.H.I.
Ferreira, J.R. Camacho
2019/07/15
|

Abstract
For a Small Hydropower Plant (SHP), theinstallation
capacity is one of the most important issues in planning step. This paper
presents a methodology for the capacity sizing of SHP based on assured
energy. The analyzes were substantiated on historical series with daily
streamflow data, operating limits of the turbines, forced unavailability
due to the minimum streamflow of the turbine, Turbine efficiency variation
in function of the streamflow variation and a project with two turbines
operating in parallel of different type and size. The methodology was
developed at the Tijuco River Basin in Brazil, with the data of Ituiutaba
fluviometric station. It was used the time series from 1975 to 2017 (43
years). The results show that the analysis can be executed already in
the initial phases of a hydroelectric project of the SHP.
| Published in: Renewable Energy
& Power Quality Journal (RE&PQJ, Nº. 17) |
| Pages: 14-18 |
Date of Publication: 2019/07/15 |
| ISSN: 2172-038X |
Date of Current Version:2019/04/10 |
| REF: 203-19 |
Issue Date: July 2019 |
| DOI:10.24084/repqj17.203 |
Publisher: EA4EPQ |
Authors and affiliations
J.H.I. Ferreira1, J.R. Camacho2
1. Instituto Federal do Triângulo Mineiro Câmpus Ituiutaba
(Brazil)
2. School of Electrical Engineering, Universidade Federal de Uberlândia,
Brazil
Key words
Small Hydropower Plant, Assured Energy, Renewable Energy,
Turbine Efficiency, Hydroelectric Potential Estimate.
References
[1] C. S. M. Júnior, I. C. Nasser, M. M. Filho,
O. L. Tortelli. Estimating the physical guarantee of hydroelectric
plants with non-centralized dispatch. Brazilian Journal of Energy,
2016, v.22, n.2, p.44-53. {In portuguese}
[2] B. T. C. Vasconcellos. Analysis of the physical guarantee of
hydroelectric plants not centrally dispatched and the potential of hybrid
complementation. MSc Dissertation, Universidade Federal de Itajubá,
Itajubá, Minas Gerais, Brazil, 2018. {In portuguese}
[3] ANEEL National Electrical Energy Agency. Resolution no 673,
August 4, 2015. Establishes the criteria for the framework of hydroelectric
use in the condition of Small Hydroelectric Power Plant. Official Diary
of the Union, Brasília, FD, August 31, 2015, Section 1; p.118.
{In portuguese}
[4] M. L. B. Silva. Analysis of the methodology of the MME / ANEEL
for the calculation of the amounts of assured energy and energy physical
guarantee of SHPs: Case study of a SHP. End of course work, Universidade
Federal de Santa Catarina, Florianópolis, Santa Catarina, Brazil,
2016. {In portuguese}
[5] ANEEL National Electrical Energy Agency. Technical Note no
63, August 29, 2012. Definition of regulatory parameters associated with
the approval of basic projects of hydroelectric plants not centrally dispatched.
{In portuguese}
[6] MME Ministério de Minas e Energia. Ordinance no.463,
December 3, 2009. Establishes the methodology for calculating and reviewing
the amounts of energy physical guarantee of Hydroelectric Power Plants
not centrally dispatched by the National Electric System Operator - ONS.
Official Diary of the Union, Brasília, DF, December 4, 2009, Section
1, p.74. {In portuguese}
[7] ANEEL National Electrical Energy Agency. Technical Note no
68, September 6, 2013. Analysis of contributions in AP 068/2012, referring
to the definition of regulatory parameters associated to the approval
of basic projects of not centrally dispatched hydroelectric plants. {In
portuguese}
[8] SEMI Industrial. SHP Small Hydro Plant. Available at: http://www.semi.com.br
{In portuguese}
[9] Anagnostopoulos JS, Papantonis DE. Optimal sizing of a run-of-river
small hydropower plant. Energy Conversion & Management 2007; 48:2663-2670.
https://doi.org/10.1016/j.enconman.2007.04.016.
[10] Barrero JMB, Muro JCSD, Macías EJ, de la Parte MP. Comparasion
in the aplication of the exploitation by optimal head model to hydroelectric
power station in run-of-river systems with different types of turbines.
Renewable Energy & Power Quality Journal 2011; 9:1338-1343. https://doi.org/10.24084/repqj09.643.
[11] Brazilian Power Plants. Guidelines for studies and small-scale projects
Hydraulics. Rio de Janeiro, Brazil, 2000. 458 p. {In portuguese}.
[12] National Water Agency. National information system on water resources.
Availabe from: <http://www.snirh.gov.br. {In portuguese}
[13] MINAS GERAIS INSTITUTE OF WATER MANAGEMENT. Ordinance nº 49,
de July 01 2010. Establishes the procedures for the regularization of
the use of water resources in the state of Minas Gerais, Executive Power
Journal, Belo Horizonte, MG, Brazil, July 06,. 2010. {In portuguese}.
[14] A. A. Reis, M. Naghettini and M. D. Melo, Comparative Study,
Application and Setting Appropriate Methodologies to Determine the Ecological
Flow in Pará River Basin, in Minas Gerais State, XVII Brazilian
Symposium of Water Resources, 2007. {In Portuguese}.

|
|