Operation of small isolated power system with large non-controllable RES penetration – System Operator’s experience in El Hierro Island


R. Corujo, P. Santos and R. Ascanio

2019/07/15

Abstract

The Canary Islands are facing a transitiontowards renewable energy, in an attempt to build a cleaner and cheaper power system for the coming years.
This transition poses a big challenge for the TSO that will face the operation of weak grids, with a large amount of non-controllable generation, in a context of reduced natural inertia.
In this context the methodology and operational criteria of El Hierro’s power system, operated by the TSO, are to maximize the amount of renewable energy in a safe way, minimizing the risks associated with the unpredictability of wind-power, and to do so minimizing the electrical power generation cost.
This paper shares the REE experience in the operation of a small isolated power system with large non-controllable RES that, as a result, has established a new record in 2018, where the the pumped storage hydro facility named Central Hidroeólica de El Hierro (CHE) covered the complete island’s demand during 18 consecutive days, more than two weeks where the diesel power plant was completely off and the island was therefore 100% renewable.

Published in: Renewable Energy & Power Quality Journal (RE&PQJ, Nº. 17)
Pages: 128-132 Date of Publication: 2019/07/15
ISSN: 2172-038X Date of Current Version:2019/04/10
REF: 242-19 Issue Date: July 2019
DOI:10.24084/repqj17.242 Publisher: EA4EPQ

Authors and affiliations

R. Corujo1, P. Santos1 and R. Ascanio1
1. Isolated System Department Red Eléctrica de España S.A.U. (REE). Alcobendas, Madrid (Spain)

Key words

Isolated systems, TSO, RES, storage, pumped hydro.

References

[1] K.D. Orwig, M.L. Ahlstrom, V. Banunarayanan, J. Sharp, J.M. Wilczak, J.F. Freedman, S.E. Haupt, J. Cline, O. Bartholomy, H.F. Hamann, B.M. Hodge, C.Finley, D. Nakafuji, J.L. Peterson, D. Maggio, M. Marquis, “Recent Trends in Variable Generation Forecasting and Its Value to the Power System”, in Proc. IEEE TRANSACTIONS ON SUSTAINABLE ENERGY 2015.
[2] A. Marrero, E.J. Medina, J.M. de León, 2018, “Gorona del Viento Wind-Hydro Power Plant Results, Improvement Actuations and Next Steps”, in Proc. 3rd International Hybrid Power System Workshop 2018.
[3] M. Pezic, V. Moray, “Unit Commitment in Fully Renewable Hydro-Wind Energy System”, 2013.
[4] P. Tielens, D. Van Hertem, “Grid Inertia and Frequency Control in Power Systems with High Penetration of Renewables”, in Proc. Young Researchers Symposium in Electrical Power Engineering, 2012.
[5] N. Taveira, J. Palomares, E. Quitmann, “The Hybrid Power Plant in El Hierro Island: Facts and Challenges from the Wind Farm Perspective”, in Proc. 3rd International Hybrid Power System Workshop 2018.
[6] C.A. Platero, C. Nicolet, J.A. Sánchez, B. Kawkabani, “Increasing wind power penetration in autonomous power systems through no-flow operation of Pelton turbines”, , in Proc. Renewable Energy 2014.
[7] J.I. Sarasúa, G. Martínez-Lucas, C.A. Platero, J.A. Sánchez-Fernández, “Dual Frequency Regulation in Pumping Mode in a Wind-Hydro Isolated System” in Proc. Energies 2018.